← Back to Endeavor scorecard

Contract Architecture & Comparative Analysis

Scheduling Protections

How effectively does the agreement limit schedule construction, involuntary assignments, and disruption?

What matters: Endeavor uses preferential bidding, minimum days off, and defined limits on extensions and junior assignments, with specified exceptions. LOA 20 adds a payment floor for qualifying five-day line-built trips; later LOA 24 provides a separate conditional failed-commute reporting pathway.

Endeavor contract clauses · American contract clauses · ATI contract clauses · CWA-AFA carriers · Air Wisconsin clauses · Published scores · All carrier reports

Endeavor Air: what the provisions establish

Contract score: 4.3/5. This value is the earlier published assessment of the base agreement and LOA 20. Subsequent amendments discussed here have not been separately reflected in a recalculated score. See CrewSignal's Endeavor scorecard. The contract provisions below explain its strengths and limitations; they do not constitute a new numerical calculation.

IssueProtection or procedureQualificationSource
Bidding and days offPBS is used for monthly schedule construction. Full-time schedules generally carry 10 to 12 minimum days off depending on bid-month length; voluntary waivers and proration are specified.The line-building system remains subject to contractual parameters and a union review process.CBA §5.C (PDF p.30); CBA §5.D.3 (PDF p.31)
Involuntary assignmentsSection 5.H restricts extensions and junior assignments, including numerical limits, decline rights and premium-pay terms.The last-available exception and applicable premiums mean the rules are bounded, not an absolute veto.CBA §5.H.5–6 (PDF pp.41–42)
Five-day tripsLOA 20 §C provides at least 25 hours of Pay Credit for qualifying five-day trips built in line construction.The additional value is for pay only, not schedule credit; it does not replace duty/rest or monthly scheduling requirements.LOA 20 §C (PDF p.2)
Failed-commute noticeLOA 24 revises Section 6.L for qualifying failed commutes, including reporting and travel-option requirements.Protection against discipline is conditional and does not turn missed duty into automatic pay or schedule credit.LOA 24 §6.L (PDF p.2)

Important limitation: A 25-in-5 payment floor is not additional schedule credit. LOA 24's commuter protection applies only when its specific eligibility, notice, and documentation requirements are met.

American Airlines: Bidding, assignments and corrections

Existing APFA score: 4.0/5. The 2024–2029 agreement establishes the provisions summarized below. Return to American's scorecard. The score is retained from the existing assessment, not recalculated from these three examples.

ProvisionWhat is protectedCondition or exceptionContract source
Bidding and schedule reviewSection 10.A provides for a Joint Scheduling Committee and scheduling-data access; the agreement also sets rules for sequence construction and rescheduling.Committee participation is not a blanket veto over every scheduling change.CBA §10.A; CBA §10.J
Involuntary assignmentSection 10.I refers involuntary assignments to the priority order in §12.O, including limits for lineholders on days off.Scheduling limits vary with eligibility, seniority, and available reserves.CBA §10.I; CBA §12.O
Scheduling errors after reportSection 10.T.3 prescribes 100% pay and credit plus 50% additional pay without credit for qualifying after-report violations.The rule excludes errors otherwise covered by §10.T.1–2 and disputes about whether a breach occurred may require §§30–31 proceedings.CBA §10.T.3

Reading the result: These provisions establish meaningful protections and a defined pay response to certain violations, but the current 4.0 score is not a new calculation of how often management complies or an indication that every error qualifies.

Some contractual provisions were phased in, and APFA publishes later agreements separately. For current operational applicability, consult the APFA electronic contract library and implementation information.

Air Transport International: Published bids, reserve contact and assignments

Published ATI score: 3.6/5. The signed 2025–2029 agreement establishes the protections described below. Return to ATI's scorecard. These clauses explain the published assessment; they do not introduce a new numerical calculation.

IssueContract protectionConditions and exceptionsSource
Bid processBid lines are published at least 15 days before a bid unit, with a four-day bid period, seniority awards and a 48-hour protest window.The Company chooses bid-unit structures and, in certain circumstances, may place unawarded employees.CBA §3.C
Reserve responseReserves are contactable 0600–1800 home-base local time, with a 30-minute assignment confirmation and no less than three hours to report from the initial call.Daily check-in and on-duty exceptions affect the practical Reserve obligation.CBA §3.D.12
Changing operationsThe Company may change operations and scheduling practices on service or business grounds.It must notify the union and negotiate the effects; the clause does not guarantee that the change is prohibited.CBA §3.D; CBA §3.E

Important distinction: Scheduled days off in the normal 28-day model should not be treated as a universal, unqualified minimum.

ATI's July 2025 implementation LOA anticipated an earlier ratification. For the post-ratification dates, consult the CWA-AFA transition schedule and the ATI implementation chronology.

Air Wisconsin: Bid limits, Reserve assignments and flying hours

Existing published score: 3.7/5. These are the original 2020 CBA provisions, used to explain the retained score. Return to Air Wisconsin's scorecard. The September 2026 tentative agreement did not ratify; a separately reported wage increase has not been incorporated into the historical score.

IssueContract provisionCondition or exceptionRead the text
Bidding and correctionBid lines may contain up to 95 block hours, while the average constructed line at a base is limited to 88; bid awards have defined posting and protest periods.Awards need timely review. A 95-hour actual-block limit also applies under Section 10.A, with voluntary waiver.§11.B; §11.D; §10.A
Reserve and airport standbyReady Reserve positions are capped at 25% of a domicile's Reserve complement, with nine-hour shifts normally used and a ten-hour continuous maximum.The Company can revise a shift subject to advance notice and other conditions.§11.L; §11.L.4–5
Involuntary days-off workDrafting normally follows prescribed assignment order and cannot be required more than ten times per calendar year.A drafted employee selects the contractual premium or replacement-day treatment; those alternatives are not cumulative.§11.M–N; §6.K

Why it matters: The 95-hour monthly limit measures actual block flying, not all forms of credit; an employee may voluntarily exceed it.

For successor negotiations and the January 2026 wage announcement, see the Air Wisconsin Key Documents section.

CWA-AFA carrier evidence and contract status

Use the agreement's status and effective date before comparing the score. Hawaiian's 2025 extension and Norse's 2025 successor use already-published updated assessments. Spirit and superseded Mesa are historical; Eastern and GoJet are ratified but not numerically scored; Breeze and Avelo remain in first-contract bargaining. A missing score is not zero.

View CWA-AFA agreement sources and domain profiles (16 carriers)
CarrierPublished scoreAgreement statusContract source
Alaska Airlines4.2 / 52025–2028 ratified CBASec. 10 scheduling
Breeze AirwaysNot scoredFirst contract bargaining — no rated ratified CBANo scored CBA
Eastern AirlinesNot scored2025 first agreement ratified; no numeric assessmentAgreement text
Frontier Airlines4.3 / 52019–2024 agreement; successor bargainingArt. 5 scheduling
GoJet AirlinesNot scored2025–2029 successor ratified; no numeric assessmentAgreement text
Hawaiian Airlines4.4 / 52025 ratified extension; 2020 baseline superseded in relevant termsScheduling and Reserve extension
Spirit Airlines3.8 / 5Operations ceased May 2026; historical scoreSec. 8 scheduling
United Airlines (2026 agreement)3.9 / 52026–2031 ratified and operative; implementation staggered2026 scheduling/Reserve
Avelo AirlinesNot scoredFirst contract bargaining — no rated ratified CBANo scored CBA
Envoy Air4.2 / 52021–2026 CBA, successor bargaining ongoingSecs. 8–9 scheduling/Reserve
Horizon Air3.4 / 52020–2024 agreement, mediated successor talksScheduling/Reserve
Mesa Airlines (legacy agreement)3.6 / 5Mesa-only historical agreement; combined JCBA ratified January 2026Mesa-only scheduling
Norse Atlantic Airways3.6 / 52025–2028 ratified successor; earlier agreement historicalArt. 6 scheduling
Omni Air International3.2 / 52017–2022 baseline; 2026 proposal rejectedSec. 14 scheduling
Piedmont Airlines3.7 / 52022–2026 agreement; bargaining continuesSecs. 7/9 scheduling
PSA Airlines3.5 / 52019–2023 agreement; rejected 2026 TA not operativeSecs. 8/9 scheduling

These numerical values summarize CrewSignal's existing carrier assessments; they are not a new recalculation or a claim about union dues, member satisfaction, arbitration recoveries or employer compliance. Read the controlling agreement section and any amendment before applying the language to an individual case.

Selected carrier scorecards

These are existing CrewSignal domain scores from the linked carrier reports. They have not been recalculated using a new common point-allocation method. The provisions behind other carriers' figures require their own source-by-source review; a similar number does not mean equivalent protection.

Explore all carrier scorecards

The directory below links to 28 carrier analysis pages. Twenty-four display a value for this domain and four are unscored. Differences in agreement dates, amendments, operating models, and representational history can affect comparisons. The Mesa entry refers to the legacy CWA-AFA agreement.

View the complete carrier score directory (28 entries)
Union / representativeCarrier analysisExisting score
APFAAmerican Airlines4.0 / 5
CWA-AFAAir Transport International3.6 / 5
CWA-AFAAir Wisconsin3.7 / 5
CWA-AFAAlaska Airlines4.2 / 5
CWA-AFAAvelo AirlinesNot scored
CWA-AFABreeze AirwaysNot scored
CWA-AFAEastern AirlinesNot scored
CWA-AFAEndeavor Air4.3 / 5
CWA-AFAEnvoy Air4.2 / 5
CWA-AFAFrontier Airlines4.3 / 5
CWA-AFAGoJet AirlinesNot scored
CWA-AFAHawaiian Airlines4.4 / 5
CWA-AFAHorizon Air3.4 / 5
CWA-AFAMesa Airlines (legacy agreement)3.6 / 5
CWA-AFANorse Atlantic Airways3.6 / 5
CWA-AFAOmni Air International3.2 / 5
CWA-AFAPiedmont Airlines3.7 / 5
CWA-AFAPSA Airlines3.5 / 5
CWA-AFASpirit Airlines3.8 / 5
CWA-AFAUnited Airlines (2026 agreement)3.9 / 5
IAMAWCommuteAir3.4 / 5
IAMAWNational Airlines2.8 / 5
IBTNetJets3.4 / 5
IBTRepublic Airways3.6 / 5
TWUAllegiant Air3.6 / 5
TWUFlight Services International2.6 / 5
TWUJetBlue Airways3.4 / 5
TWUSouthwest Airlines3.5 / 5

“Not scored” means no numerical score is published in that carrier report; it does not mean zero protection.

How to interpret these scores

Numerical scorecards are summaries of contract design, not measurements of union diligence, actual grievance recovery, or value per dollar of dues. A defensible substantive comparison checks the operative contract and amendments, identifies matching employee circumstances, and compares both entitlements and exceptions. Published scores are useful starting points, but small differences such as 0.1 should not be treated as independently validated levels of precision.

Read the CrewSignal Contract Analysis Criteria for the structural methodology. The separate Reserve-specific evaluation uses a different framework.