← Back to Endeavor scorecard

Contract Architecture & Comparative Analysis

Clarity & Modularity

Can readers find the controlling rule without overlooking an amendment, exception, or effective-date change?

What matters: The base agreement supplies detailed definitions and procedures but no longer contains every operative change. LOA 20 revises compensation and duration; later letters change commuter, safety-reporting and uniform terms. Readers must follow the applicable amendment as well as the original clause.

Endeavor contract clauses · American contract clauses · ATI contract clauses · CWA-AFA carriers · Air Wisconsin clauses · Published scores · All carrier reports

Endeavor Air: what the provisions establish

Contract score: 3.0/5. This value is the earlier published assessment of the base agreement and LOA 20. Subsequent amendments discussed here have not been separately reflected in a recalculated score. See CrewSignal's Endeavor scorecard. The contract provisions below explain its strengths and limitations; they do not constitute a new numerical calculation.

IssueProtection or procedureQualificationSource
Defined terms and proceduresSection 2 defines pay credit, schedule credit, and related scheduling concepts, while Sections 3 and 5 contain detailed procedural rules.Cross-references and exceptions make the provisions more difficult to apply without careful reading.CBA §2 (PDF pp.7–14); CBA §5 (PDF p.29)
Compensation complexityThe trip guarantee and minimum-day rules distinguish scheduled and actual time, trip structure, and certain employee-initiated changes.A headline hourly rate cannot substitute for the separate pay and credit formulas.CBA §§18.E–F (PDF pp.106–109)
Duration and integrated amendmentsThe printed CBA §20.A contains the original March 2025 end date; LOA 20 §G replaces it with March 31, 2027, and §H requires the publication of updated integrated contract text.An archived base agreement must be read with LOA 20. A publication obligation does not, by itself, prove what version was distributed.CBA §20 (PDF p.119); LOA 20 §§G–H (PDF p.5)
Subsequent changesLater LOAs address commuting, voluntary aviation safety reporting, and uniform accounts without replacing the entire base agreement.Reading only the 2020 PDF or LOA 20 can miss a controlling later change; an obligation to publish an integrated version does not prove which edition an employee received.LOA 24; revised LOA 22; LOA 25; CWA-AFA Endeavor contract library

Important limitation: The published clarity score describes the original base-plus-extension evaluation. It has not been numerically adjusted for all later letters or used to find that an integrated publication requirement was breached.

American Airlines: Definitions, cross-references and implementation

Existing APFA score: 2.5/5. The 2024–2029 agreement establishes the provisions summarized below. Return to American's scorecard. The score is retained from the existing assessment, not recalculated from these three examples.

ProvisionWhat is protectedCondition or exceptionContract source
Defined conceptsSection 2 defines credited hours, reserve and trip-related terms used throughout the agreement.The definitions do not eliminate the need to check cross-referenced conditions and exceptions.CBA §2
Complex administrationSections 10–12 contain detailed bidding, rescheduling, hours-of-service, and Reserve mechanisms.A single statement about 'scheduling' may cross multiple sections; eligibility changes the outcome.CBA §10; CBA §11; CBA §12
Amendments and effective datesSection 39 addresses amendments and the official APFA contract library maintains separate current-section PDFs, letters, and implementation information.A contract provision's publication date does not establish that every staged feature was operational on the same date.CBA §39; APFA contract library; APFA letters

Reading the result: The preserved 2.5 score expresses document complexity, not a finding that the text is unenforceable or that every amendment is missing.

Some contractual provisions were phased in, and APFA publishes later agreements separately. For current operational applicability, consult the APFA electronic contract library and implementation information.

Air Transport International: Definitions and contract amendments

Published ATI score: 4.4/5. The signed agreement contains the provisions below. Return to ATI's scorecard. These clauses explain the existing assessment without changing its numerical value.

IssueContract protectionConditions and exceptionsSource
Sixteen-section agreementThe agreement separates definitions, scheduling, pay, travel and grievance provisions into subject sections.Exceptions and cross-references still affect the result.CBA §2; CBA §3
Pay and implementationThe 56-hour BUG and credit rules are defined within the agreement; the union also publishes a separate implementation letter.A signed agreement's effective date does not prove that each staged change is operational.CBA §4.D–F
Management and grievance languageSections 13 and 14 respectively describe residual management authority and enforcement pathways.Specific employee rights still require reading the applicable conditions, signed letters and dates.CBA §13; CBA §14

Important distinction: Clarity of drafting does not automatically mean stronger substantive constraints on management.

ATI's July 2025 implementation LOA anticipated an earlier ratification. For the post-ratification dates, consult the CWA-AFA transition schedule and the ATI implementation chronology.

Air Wisconsin: Definitions, multiple sections and historical versions

Existing published score: 3.2/5. These are the original 2020 CBA provisions, used to explain the retained score. Return to Air Wisconsin's scorecard. The September 2026 tentative agreement did not ratify; a separately reported wage increase has not been incorporated into the historical score.

IssueContract provisionCondition or exceptionRead the text
Organized but interdependentThe agreement has 28 numbered sections and appended letters, with pay, duty, and scheduling provisions spread across distinct sections.The controlling rule can depend on a definition, a later exception or an amendment.Contents; §2
Time-credit interpretationActual block hours, pay credits, trip rigs and monthly guarantees are distinct concepts with different exclusions.The 95-hour cap covers actual flight block time, not every credited pay hour.§10.A; §6.B–D; §6.N
Agreement status and pay tableSection 28 sets renewal and notice mechanics. The September 2026 tentative agreement was not ratified.A later reported wage increase requires its own executed source for a current-pay calculation.§28

Why it matters: This page explains the older agreement's architecture, not a ratified 2026 successor or an authenticated modern pay table.

For successor negotiations and the January 2026 wage announcement, see the Air Wisconsin Key Documents section.

CWA-AFA carrier evidence and contract status

Use the agreement's status and effective date before comparing the score. Hawaiian's 2025 extension and Norse's 2025 successor use already-published updated assessments. Spirit and superseded Mesa are historical; Eastern and GoJet are ratified but not numerically scored; Breeze and Avelo remain in first-contract bargaining. A missing score is not zero.

View CWA-AFA agreement sources and domain profiles (16 carriers)
CarrierPublished scoreAgreement statusContract source
Alaska Airlines3.5 / 52025–2028 ratified CBADefinitions and duration
Breeze AirwaysNot scoredFirst contract bargaining — no rated ratified CBANo scored CBA
Eastern AirlinesNot scored2025 first agreement ratified; no numeric assessmentAgreement text
Frontier Airlines3.1 / 52019–2024 agreement; successor bargainingArt. 28 duration
GoJet AirlinesNot scored2025–2029 successor ratified; no numeric assessmentAgreement text
Hawaiian Airlines2.8 / 52025 ratified extension; 2020 baseline superseded in relevant termsMulti-document agreement
Spirit Airlines3.8 / 5Operations ceased May 2026; historical scoreSec. 26 duration
United Airlines (2026 agreement)3.1 / 52026–2031 ratified and operative; implementation staggered2026 LOAs
Avelo AirlinesNot scoredFirst contract bargaining — no rated ratified CBANo scored CBA
Envoy Air2.9 / 52021–2026 CBA, successor bargaining ongoingDefinitions and duration
Horizon Air3.6 / 52020–2024 agreement, mediated successor talksAgreement terms
Mesa Airlines (legacy agreement)3.4 / 5Mesa-only historical agreement; combined JCBA ratified January 2026Mesa-only duration
Norse Atlantic Airways3.7 / 52025–2028 ratified successor; earlier agreement historicalArts. 2/22 definitions
Omni Air International3.4 / 52017–2022 baseline; 2026 proposal rejectedSec. 24 duration
Piedmont Airlines3.8 / 52022–2026 agreement; bargaining continuesSec. 32 duration
PSA Airlines3.6 / 52019–2023 agreement; rejected 2026 TA not operativeSec. 26 duration

These numerical values summarize CrewSignal's existing carrier assessments; they are not a new recalculation or a claim about union dues, member satisfaction, arbitration recoveries or employer compliance. Read the controlling agreement section and any amendment before applying the language to an individual case.

Selected carrier scorecards

These are existing CrewSignal domain scores from the linked carrier reports. They have not been recalculated using a new common point-allocation method. The provisions behind other carriers' figures require their own source-by-source review; a similar number does not mean equivalent protection.

Explore all carrier scorecards

The directory below links to 28 carrier analysis pages. Twenty-four display a value for this domain and four are unscored. Differences in agreement dates, amendments, operating models, and representational history can affect comparisons. The Mesa entry refers to the legacy CWA-AFA agreement.

View the complete carrier score directory (28 entries)
Union / representativeCarrier analysisExisting score
APFAAmerican Airlines2.5 / 5
CWA-AFAAir Transport International4.4 / 5
CWA-AFAAir Wisconsin3.2 / 5
CWA-AFAAlaska Airlines3.5 / 5
CWA-AFAAvelo AirlinesNot scored
CWA-AFABreeze AirwaysNot scored
CWA-AFAEastern AirlinesNot scored
CWA-AFAEndeavor Air3.0 / 5
CWA-AFAEnvoy Air2.9 / 5
CWA-AFAFrontier Airlines3.1 / 5
CWA-AFAGoJet AirlinesNot scored
CWA-AFAHawaiian Airlines2.8 / 5
CWA-AFAHorizon Air3.6 / 5
CWA-AFAMesa Airlines (legacy agreement)3.4 / 5
CWA-AFANorse Atlantic Airways3.7 / 5
CWA-AFAOmni Air International3.4 / 5
CWA-AFAPiedmont Airlines3.8 / 5
CWA-AFAPSA Airlines3.6 / 5
CWA-AFASpirit Airlines3.8 / 5
CWA-AFAUnited Airlines (2026 agreement)3.1 / 5
IAMAWCommuteAir3.9 / 5
IAMAWNational Airlines3.1 / 5
IBTNetJets3.5 / 5
IBTRepublic Airways3.4 / 5
TWUAllegiant Air3.6 / 5
TWUFlight Services International3.1 / 5
TWUJetBlue Airways3.1 / 5
TWUSouthwest Airlines3.1 / 5

“Not scored” means no numerical score is published in that carrier report; it does not mean zero protection.

How to interpret these scores

Numerical scorecards are summaries of contract design, not measurements of union diligence, actual grievance recovery, or value per dollar of dues. A defensible substantive comparison checks the operative contract and amendments, identifies matching employee circumstances, and compares both entitlements and exceptions. Published scores are useful starting points, but small differences such as 0.1 should not be treated as independently validated levels of precision.

Read the CrewSignal Contract Analysis Criteria for the structural methodology. The separate Reserve-specific evaluation uses a different framework.